The existing water system is aged, has suspected leaks, poorly performing valves, and deficiencies in fire hydrant flow rates and pressures.

The existing water system is aged, has suspected leaks, poorly performing valves, and deficiencies in fire hydrant flow rates and pressures.

The proposed improvements include:

  • Replacement of 18,700 linear feet of leaking and undersized water mains and service lines
  • The remediation of the distribution system to provide the minimum required 20 pounds per square inch pressure at all fire hydrants during fire flow plus maximum daily flow conditions
  • The replacement of all non-functioning emergency isolation valves (up to approximately 100) and fire hydrants (up to 36) throughout the community.

The expected benefits of the project will be a reduction in currently unquantified water loss, compliance with current standards for fire safety, and restored emergency isolation valve control in case of a pipeline break or system contamination.